Realisations

Woutersbrakel Viaduct

No items found.
description

The pillars of the E17-E19 viaduct in Woutersbrakel were overhauled in 2014 with our elastic hydraulic mortar RC MULTIFLEX 2M, giving the structure an extra layer of protection.

Contractor

Locality

1440 Wouter Braine

Band-Aid
Band-Aid
Band-Aid
Woutersbrakel Viaduct
1440 Wouter Braine
View project